top of page

Data‑Driven. Decarbonized. Designed for Resiliency.

Puerto Rico’s first pure‑play Infrastructure‑as‑a‑Service platform powering the island’s next generation of self‑reliant industry. 

Image by Maurice D

01

The Challenge

7X

32%

$

Outage Frequency

Tariff Increase

Funding Challenges

PREPA outages average mainland U.S. benchmarks. 

Industrial tariffs have risen 32 % since 2017.

FEMA & CDBG‑DR funds remain under‑deployed as projects stall at permitting and capital‑stack design stages. 

02

Our Solution – IaaS Stack

Design

Develop

Drive

DESIGN 

 Site & load analytics, Tariff modeling, ESG KPI mapping   

DEVELOP 

Origination, FEED, Interconnection & PREB approvals, “Cost‑to‑complete” budgeting

  

DRIVE 
24/7 asset management, Dispatch optimization, Revenue stacking, End‑of‑life recycling  

 

Front-end engineering and production modeling are delivered to investment-grade depth, including single-line diagrams and full “cost-to-complete” budgets 

03

Capital Formation

Sponsor Equity

Tax Equity

transferable IRA credits (§48, §45X)  

side‑car SPVs / hold‑co structures  

Debt & Enhancements

USDA, DFC, local loan‑guarantee wraps  

Non‑Dilutive

DoE, FEMA, PR resiliency grants  

The Delos Advantage

  • Puerto Rico–Dedicated Operator — Full-time base in San Juan; hands-on with PREB docketing and LUMA interconnection studies for 1–25 MW behind-the-meter sites; bilingual permitting and environmental compliance across island municipalities.

  • Analytics-Led Design — 15-minute interval load + resource modeling to lowest-LCOE mixes; tariff engine tuned for industrial riders; PV-BESS-CHP co-optimization; bankable yield and curtailment modeling for investment cases.

  • Resilience engineered — Structural specs for Category-4 wind loads; flood-zone and corrosion-class siting; islanding/black-start controls with HIL testing; options for 48–96-hour autonomy via storage + CHP; spare-parts and fuel-readiness plans.

  • Diligence-Ready Deliverables — FEED package & single-line diagrams; interconnection application set; cost-to-complete budgets; performance baselines & M&V plan; O&M & end-of-life; ESG KPI map and a data room structured for sponsor/tax equity and lenders.

bottom of page