01
The Challenge
7X
32%
$
Outage Frequency
Tariff Increase
Funding Challenges
PREPA outages average 7× mainland U.S. benchmarks.
Industrial tariffs have risen 32 % since 2017.
FEMA & CDBG‑DR funds remain under‑deployed as projects stall at permitting and capital‑stack design stages.
02
Our Solution – IaaS Stack
Design
Develop
Drive
DESIGN
Site & load analytics, Tariff modeling, ESG KPI mapping
DEVELOP
Origination, FEED, Interconnection & PREB approvals, “Cost‑to‑complete” budgeting
DRIVE
24/7 asset management, Dispatch optimization, Revenue stacking, End‑of‑life recycling
Front-end engineering and production modeling are delivered to investment-grade depth, including single-line diagrams and full “cost-to-complete” budgets

03
Capital Formation
Sponsor Equity
Tax Equity
transferable IRA credits (§48, §45X)
side‑car SPVs / hold‑co structures
Debt & Enhancements
USDA, DFC, local loan‑guarantee wraps
Non‑Dilutive
DoE, FEMA, PR resiliency grants
The Delos Advantage
-
Puerto Rico–Dedicated Operator — Full-time base in San Juan; hands-on with PREB docketing and LUMA interconnection studies for 1–25 MW behind-the-meter sites; bilingual permitting and environmental compliance across island municipalities.
-
Analytics-Led Design — 15-minute interval load + resource modeling to lowest-LCOE mixes; tariff engine tuned for industrial riders; PV-BESS-CHP co-optimization; bankable yield and curtailment modeling for investment cases.
-
Resilience engineered — Structural specs for Category-4 wind loads; flood-zone and corrosion-class siting; islanding/black-start controls with HIL testing; options for 48–96-hour autonomy via storage + CHP; spare-parts and fuel-readiness plans.
-
Diligence-Ready Deliverables — FEED package & single-line diagrams; interconnection application set; cost-to-complete budgets; performance baselines & M&V plan; O&M & end-of-life; ESG KPI map and a data room structured for sponsor/tax equity and lenders.